On/Off-Hire Survey condition after repair or reconstruction, pre-entry condition, inspection of stevedore’s damage, collision damage, inspection of damage to jetties, shore cranes

on-off-hire-survey

Some parts of the vessel’s structure, especially where damage may result from the operation of the vessel, loading or unloading of cargo, require special attention when entering or leaving the vessel from the charter. During this examination, measurements and fixing of fuel reserves (Bunker Survey) are carried out, as well as holds for readiness for acceptance of cargo (Hold Condition Inspection), and watertightness of hatches are checked.